PAS has accomplished all the requirements of the Egyptian Civil Aviation Authority to practice washing Electric Insulators and agreed with Egyptian Electricity transmission Company (EETC) for all Contract terms.
The Contract for one-year renewable. The scope of work is cleaning 15000 insulators under pressure 500 KVA for Electric towers. In order to keep Smooth operations for that mission, PAS assigned two equipped Helicopter type Bell 206-L3 for with availability for Back up (if needed).